SAVED: PAGE: ACTIVE AREA:

Carluke Health Centre Replacement

Client / Main Contractor: Graham Construction

Building: Carluke Health Centre

Consultant: Hawthorne Boyle

Type: Electric

Value: £900,000

Date: 12/07/2013

The new community health centre will provide a wide range of general practitioner led services such as diabetes, electrocardiogram (ECG) and chronic disease management clinics as well as clinics covering coronary heart disease, asthma, stroke and blood pressure.

Carluke Health Centre

Other services will include podiatry, speech and language therapy, child immunisation and surveillance, physiotherapy, dietetics, community mental health (psychology, psychiatry), older peoples' outreach service, locality alcohol and drug services, smoking cessation, homeopathy, community dental service, health visiting and parentcraft.

Services included/installed–

  • • Main Switchboards
  • • Individual distribution
  • • Main and sub-main cabling
  • • Containment systems
  • • Lighting and Emergency lighting
  • • Surgical lighting
  • • Electric Heating
  • • Small power
  • • Fire alarm system
  • • External Lighting
  • • Mechanical Supplies
  • • Lift Electrical Supplies
  • • Disabled Alarm Call System
  • • Data/Comms Installation
  • • Television Installation
  • • Security Installation
  • • Audio Door Access
  • • CCTV system
  • • Earthing and Bonding
  • • Lightning Protection
  • • Electrical testing fully complying with BS 5839: Part 1: 1988, BS EN ISO 9000-2000 and the 17th Edition of the IEE Wiring Regulations
  • • Full handover package including as fitted drawings and Operational and Maintenance manuals provided in CD Rom format

We Can Do The Same For You...

Our sales team are available to discuss your next project.

Give us a call on: +44 (0)1698 372113, or send a quick enquiry and let us get back to you.

Send Enquiry

> Callum McGarrigle representing WMQ at UK Electrical Competition16-11-2018

Callum takes on the best UK apprentices at the WorldSkills UK Competition in the Electrical Installation category

> Drug Testing12-11-2018

Random Drug Testing introduced to support and protect the workforce.

> Safe systems of work07-11-2018

Always striving to improve the Health and Safety practices throughout the business.

> Gorbals Health and Social Care Centre02-11-2018

Work draws to a conclusion at this community hub

Close

Contact Us

 

 

 

No Robots:

This form collects and sends the information supplied to WMQ Scotland. You can read our privacy policy for full details on how we protect and manage your data.
  I consent to having WMQ Building Services collect the above details.